Location: Valencia, Spain  | Client: UTE San Isidro, ADIF
Phase: Built
Year: 2014
Design Team: DOF Engineers


 

The project consists of the design of several structures:


Pass over the existing wastewater collector. In order not to affect the walls of the existing collector, a 10m long x 9m wide x 600mm in-situ concrete top slab – where the railways will be installed – fully fixed to the concrete pile caps each side of the collector has been designed.  Piles are drilled φ1m and 12m long.


The project also includes additional structures around an existing gallery for a water-supply pipe. This consists of new walls parallel to the pipe to support the in-situ slab where the railways are to be installed. 


 

© DOF engineers 2017 . All rights reserved. Disclaimer and legal notice