Location: Kvikne, Norway | Client: Tynset Kommune
Phase: Built
Year: 2008-2009 | Construction cost: NOK 2 000 000
Design Team: Ola Grønn-Hagen, DOF Engineers


Suspension footbridge in timber with a span of 42m. The bridge was opened in 2009.














Images © Ola Grønn-Hagen / DOF Engineers

© DOF engineers 2017 . All rights reserved. Disclaimer and legal notice